Adjust sub-contracted supplied items

I want to sub-contract some items to be made and supplying raw materials. I have a BOM already defined. I would like to adjust the quantities for the raw material to be supplied. Sometimes I want to include extras incase material break, lost, or whatever. How can I go about doing so.

I’ve looked at this document already: https://erpnext.org/docs/user/manual/en/manufacturing/subcontracting

[Feature Request][Paid Development] Material Transfer for Subcontracting should not be restricted as per BOM · Issue #12150 · frappe/erpnext · GitHub , this issue covers your requirement.

Hi @dhananjay, this is great. is this going into the main branch and if so when?

There are some design challenges that developers are facing, but whenever it is through it will definitely be in the main branch. Difficult for me to put a date on it.