Allow Continuous Material Consumption Settings Do In Manufacturing Settings


How to PLan The capacity planning?

@Mohammed_Anas1 check this Manufacturing Settings

1 Like

Got It I asked for steps on how we can achieve but figured it
After Enabling that setting we can track total how much raw material got consumed to manufacture the final product

Once The W.O Is completed The stock entry is created for the total consumed raw material

How Can we Track and do the capacity Planning …?
I have created
Work Order
Operations
BOM
Work station
but don’t know how to do capacity planning can any one tell me…?

@Mohammed_Anas1 Capacity Planning

1 Like