Hello,
For the repair of fixed Assets the options seem quite limited, either “Completed” or “Cancelled”. Can other options such as “In Progress” or " Awaiting Parts" be added? for when the Asset is out of service and not useable, i.e. the repair requires parts that are not yet in stock or requires an external engineer to perform the work?
Or another condition such as “Awaiting Calibration” before it can be used?
Does this require fundamental changes to the Assets DocTypes/ERPNext doc states, therefore need to be a custom app?
Thanks,
Paul