Hi all,
I am currently facing the following issue; I created a Purchase Order for a Subcontracted Item of which I have received 50% so far. In order to initiate the other 50%, I wanted to make the required Material Transfer as before. The problem is that after the receiving the first 50% of the Subcontracted Item, its BOM changed.
If I select the new BOM on the Material Transfer Stock Entry that I make against the PO, I receive an error that the items do not match the ones listed on the BOM used for the PO. For Production, I found the Manufacturing Setting > Backflush based on Material Transferred option (highlighted here BOM Item change while Production is In Process ). Is any such option available for subcontracted items?
It would be great if I can transfer material and receive the Subcontracted item based on a new BOM even after raising the PO.
Thanks for any help.
Cheers