We have an Item which has multiple BOMs associated with it.
I have created the set of BOMs and everything is working perfectly.
But after BOM Palette is manufactured we need to have 2 QC Inspections.
One QC Inspection is done my the zone in-charge and another QC Inspection is done by the in-charge of the next zone (Short Blast Zone) before he takes the Palette for short blasting.
How can we force ERPNext to have two inspections between two manufacturing processes?
Regards,