Issue on setup required date in Material Request

In Material request form. the required data in all items( the child table ) will follow the value of required date on top of form.


The problem is, if I change the required date in master form again, the required date field in child table won’t change accordingly.

that is not convenience if I have lots of items.

Is there a workaround to fix this issue?

Thanks.

Hi,

I have the same problem. It costs me a lot of time to change every request date on every item. How can we solve this?

you can use the excel copy and paste feature
1.prepare the date in one excel column
2.drag (select) the column and copy(Ctrl + c)
3.place the cursor to the request date field of first row,paste (Ctrl + v)