Hello,
The current subcontracting flow I’m using is as follows:
Purchase Order → Subcontracting Order → Material Transfer to Supplier → Subcontracting Receipt → Purchase Receipt → Purchase Invoice
Issue 1:
Where during the Subcontracting Receipt step, the material consumed should logically be calculated using the following formula:
Consumed Quantity = Quantity Received × BOM Quantity
However, I’ve noticed discrepancies in the calculations for some consumed items. Despite the BOM containing only whole number quantities (no fractions), the system is generating incorrect “consumed quantity” values. As a result, I’ve had to manually adjust the figures in the Subcontracting Receipt.
Issue 2:
If two subcontracted Items share the same Raw Material. Why do I have to assign the Raw Material to a specific Item while creating “Transfer Material to Subcontractor” Stock Entry. Why can’t I just transfer the RM and let the subcontractor decide how to consume RM.
Please let me know if I’m missing something.