i want to Produce item, FG-0001 - 50qty lets suppose
I have 5 Raw materials,
2 Operations a) In-Process, b) Bulk
now each job card is linked with Quality Inspection
In-Process, Qty to produce is 50, Qty produced is also 50,
then Quality Inspection is done, sample size is 5.
This sample is consumed,
Now remaining qty left is 45,
and In-Process job card is completed.
Next is Bulk Process,
Now qty to produce should be 45 (taken from previous job card),
Qty produced is also 45, but Quality Sample is done,
Quality sample = 5,
Now this should be consumed too,
so the overall qty to be produced at work order should be 50, completed qty also 40, and consumed during quality inspections at 2 processes are 10.