Manufacturing - Routing Setup Time

In current manufacturing module, is is possible to configure a setup time per operation in a Routing ?

ex:

  • Routing A

    • Operation 1:
      • 5 minutes (per qty)
      • 10 minutes setup time
    • Operation 2
      • 3 minutes (per qty)
      • 15 minutes setup time
    • Operation 3
      • Batch Size: 50
      • 2 minutes (per qty)
      • 20 minutes setup time (since Batch Size is 50, setup time is added for each batch of 50 qty)