Hello,
There is a raw material consumption section in the ERPNext manufacturing setting.
1)Allow continuous material consumption
2) Backflush raw material based on
Can anyone please share thoughts on that, what is the purpose of that two checkboxes in manufacturing? Anyone, please share a real test for that?