Context: I have created a Multi-Level BOM. Each layer of BOM has their own operations and respectively their sequence of operations.
Coincidentally the finish product BOM and the subassembly BOM may have the same operations within them
Problem: When I tick “Use Multi-Level BOM” to create the Work Order. The sequence of BOM gets confused and the Sub Assembly’s sequence of operation all turn into 0, this leads to an error.
I can circumvent the error by manually adjusting the sequence of operations in the Work Order.
I would like a second opinion if I really have to manually edit it or did I configure something wrong?
Thank you
