operating cost is taking for total number of items to be produced in production order.
Is it possible to make it to calculate depending on number of items produced.
Ex: process cost of 1 Item to produce = 10 Rs
Cost of raw material required for 1 item = 50 Rs ( Total raw material cost = 50*100= 5000 Rs)
Production order = 100 items
produced items = 80 items
In Erpnext it takes as total used raw material cost + operating cost for items to be produced i.e. 8050+10010
I want the cost to be calculated as total used raw material cost + operating cost for produced items
8050+8010
Can anyone help me?