Hi,
i wonder if i can create a report for each production order for this problem
i want to know the actual cost vs the estimated cost of the production order , so i would like to create a report that pull all STE that linked to a Production order and sum the total of usage of each source warehouse and target warehouse , and listed all of the materials from BOM and the actual used , also the BOM total operation cost vs the actual cost that manually input from the Finish good valuation (total Finish Good - total Actual material)
if i can how can i do this ?
Thanks