Submit a Job Card without logging time?

I’m learning how to use Job Cards. I do not want to log time in my job cards at the moment. I have other ways of tracking operation time, and I don’t want to burden my employees with entering the duration of every Job Card they complete. But if I leave the Time Logs table blank, ERPNext says " Time logs are required for Job Card".

I don’t want to enter a bogus time in the log, because this data could be misinterpreted later. Is there any way to turn off the requirement? Will entering a made-up time corrupt the system in unexpected ways, like misreporting the cost to produce the finished good?

1 Like

that will be really good feature in ERP

1 Like