How to calculate / know total cost against a single production order?
It can be determined based on Total Raw-material cost + total operations cost.
In the Production Order, total Raw-material Cost if not updated. It can be seen in the Manufacture Entry made against Productio Order.
Valuation of the finished item is set based on raw-material cost + operations cost only.