Total costs (operating + material) in WorkOrder

Hi!

In a completed work order I see the actual operating time which is multiplied by the hourly rate. This results the operating costs.

However, I do not see in the work order the total cost of the raw material that was consumed.

Is this an error in my thinking? I would like to see a total of operating costs + material costs in the work order…

Can anyone give any tips?
Thanks!