In our ERPNext v16.21.1 manufacturing flow, the Transfer Material Stock Entry and the subsequent Manufacturing Stock Entry are not linked to each other.
As a result, in the Accounting Ledger, they are treated as separate transactions and debit/credit entries are posted independently for each document.
Is there a way to link these two Stock Entries so the accounting impact is handled as a single related flow?