The Calendar view for Jobs in Manufacturing shows jobs based on Posting Date.
Generally when I am looking at Jobs I need to see it from expected start dates.
Also, when I create the job, the expected start date for the job should be set by default based on what I specified in the Production Planning.
Currently that is set in time_logs field.
Anyone knows why such a behaviour was designed ?