In our factory, we use some material that we need to manufacture/produce before putting it all together, and these items (Moulds) have the default material request option to Manufacture, but in ERPNext its still getting added to the request raw material as a purchased item where the ERP should have opened a work order to manufacture these items first and the rest of the items that needs to be purchased should be added as purchase / transferred to WIP.
is there any fast way to do this or it will require changing the code instead?
quotation > sales order > request raw material > purchase > receive material via purchase
from sales order > work order > receive raw material via transfer