I was excited to load version 11 for the new production plan. I just tried it, and was optimistic when I saw the table populated with the BOM quantity (“Quantity”), and the quantity on hand (“Actual Qty”). But when I generate the materials request, it does it for the BOM quantity, not what’s needed (BOM quantity minus quantity on hand).
Please let me know how to do this. I can’t imagine there isn’t a way. Why would I always want to order the exact BOM quantity? Often, I will order in volume for a particular component and not always need to order the BOM-listed quantity for every item. I can’t imagine this isn’t possible.
Thanks.