Quality Inspection for subassembly

we will need to create a quality warehouse between shop floor and finished goods store. However, can there be a check in the system, that unless production moves material from shop floor to quality, it can’t go to finished goods store. This is to avoid any temptation to dispatch material without quality approval.
???

Be sure to check out Workflows https://erpnext.com/docs/user/manual/en/setting-up/workflows

A forum search to learn how others have used these will point to ideas you might apply in your business use case.

1 Like

For example you got this pointer here Quality checks between two warehouse

Just a word of caution multiple threads can mean confusion and duplication for your audience

This one too In Quality Inspection-(in-process), can this be used in Manufacturing-Operations? This means that the item needs to pass several QI's before it can go to the next operation? - #12 by kirthi

I will close this thread.